clean-energy.us < index

clean-energy.us < libraries

Cost of Mercury Removal from Coal-Based IGCC Relative to a PC Plant

2002 Gasification Technology Conference
San Francisco, California, USA
28 Oct 2002

Rutkowski, Michael (Parsons Infrastructure and Technology Group, Inc.)
Klett, M. (Parsons Infrastructure and Technology Group, Inc.)
Maxwell, R. (Parsons Infrastructure and Technology Group, Inc.)

Clean-Energy.us Summary

PowerPoint presentation comparing the cost of mercury removal from an IGCC plant compared to that of a PC power plant.

Clean-Energy.us Document No. 191
2. Economics and Project Financing
  A. Economics
    4. Pollution Abatement
      Cost of Mercury Removal from Coal-Based IGCC Relative to a PC Plant
Link to Full Text File (if any)
none
 Document Type PowerPoint Presentation
 Date Created 28 Oct 2002
 Date Acquired 26 May 2004
 Web Site http://www.gasification.org
 Specific URL http://www.gasification.org/Docs/2002_Papers/GTC02020x.pdf
 Copyright Owner Parsons Infrastructure and Technology Group, Inc.
 Content Pages = 26   Text? Yes   Photos? Yes   Graphics? Yes   PowerPoint? Yes  